Corporate Social Responsibility
A - / A +

The WinBis project originated in the sphere of an Agreement Protocol with the Campania Region, with the intent to contribute to the development of renewable energy sources in the region, as well as the business of upgrading technology in the already existing wind farm and thereby guaranteeing more energy efficiency.

The detailed and complete assessment of the initiative also took into consideration the typology of the site to install the wind farm.

Then according to a precise technical and authorisation process, which permitted the company to single out the best existing operational conditions and to guarantee maximum environmental respect.

In addition to standing on a suitable site, being part of the area of the Experimental Wind Farms in the Campania Region (situated in "Formicoso - La Toppa") and which is dedicated to communal energy planning; it is also far away from any inhabited areas, also the wind farm substituted some disused turbines thereby letting a requalification process take place on an abandoned production site.

The renewable energy produced on the wind farm is able to cover the annual consumption for about 22.000 families.

video
mappa

Operational headquarters

S.S. 303
Località La Toppa Formicoso
83044 Bisaccia (Avellino)